1
Premium model used for trivial tasks
Short drafting, rewriting and summarising runs on the most expensive model. Overspend is actual cost minus the list-price cost of a cheaper model.
€1,242
recoverable
€2,445 of recoverable waste found in this period, ranked by cost.
Short drafting, rewriting and summarising runs on the most expensive model. Overspend is actual cost minus the list-price cost of a cheaper model.
Sessions abandoned or retried without any output being kept.
Generated work rejected or reverted at review, measured by a low accept rate.